BEGIN:VCALENDAR
VERSION:2.0
METHOD:PUBLISH
CALSCALE:GREGORIAN
PRODID:-//WordPress - MECv7.21.0//EN
X-ORIGINAL-URL:https://allstreaminsiders.com/
X-WR-CALNAME:Allstream Insiders
X-WR-CALDESC:Positive Industry News and Events
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-PUBLISHED-TTL:PT1H
X-MS-OLK-FORCEINSPECTOROPEN:TRUE
BEGIN:VEVENT
CLASS:PUBLIC
UID:MEC-40098d4af08a53198bca329e718d901d@allstreaminsiders.com
DTSTART:20260623T130000Z
DTEND:20260625T230000Z
DTSTAMP:20260607T060800Z
CREATED:20260607
LAST-MODIFIED:20260607
PRIORITY:5
SEQUENCE:1
TRANSP:OPAQUE
SUMMARY:Register Now for the Transmission and Interconnection Summit by Infocast June 23-25, 2026 – DC
DESCRIPTION:The unprecedented growth of data centers and electrification is creating a transformative moment for the U.S. power sector. The urgent need to deliver electricity to a massive wave of new large-load customers is expected to drive more than $1.1 trillion in transmission investment while accelerating reforms that could fundamentally reshape the interconnection process and the way large loads are served.\nRegional Transmission Organizations (RTOs), Independent System Operators (ISOs), and other planning authorities are expanding their focus beyond traditional 3- to 5-year planning cycles and developing long-term 10- and 20-year transmission strategies. At the same time, many regions are exploring ways to better align transmission planning with interconnection processes to improve speed-to-power and grid reliability.\nMajor changes are underway across transmission planning, cost allocation, queue management, permitting, Grid-Enhancing Technologies (GETs), and other critical areas that determine how quickly new capacity can be added to the grid. What do these developments mean for transmission owners and operators, investors, developers, utilities, policymakers, and other industry stakeholders?\nInfocast’s Transmission & Interconnection Summit 2026 delivers the industry’s most current and comprehensive analysis of these evolving market dynamics and their impact across the power sector. Continuing a decades-long tradition of industry leadership, the event brings together policymakers, senior executives, regulators, investors, developers, and leading experts who are helping shape the future of the energy transition.\nAttendees will gain valuable insights from active market participants through in-depth discussions on today’s most pressing transmission and interconnection challenges, including:\n\nHow large-load interconnection processes may evolve under the new FERC ANOPR and the resulting implications for system upgrade cost allocation.\nThe impact of FERC Order 1920-B on transmission planning, permitting, regional coordination, and cost allocation.\nEmerging best practices under FERC Order No. 2023 in both RTO/ISO regions and regulated markets.\nHow interconnection reforms are affecting existing and new generation projects.\nThe role of artificial intelligence and advanced analytics in accelerating interconnection studies and transmission planning.\nThe effectiveness of “fast-track” interconnection programs in reducing queue delays.\nWhether integrated transmission and interconnection planning can help solve today’s speed-to-power challenges.\nStrategies for deploying Grid-Enhancing Technologies (GETs) to maximize existing transmission capacity.\nHow transmission investment priorities are evolving to strengthen grid resilience against extreme weather and other emerging risks.\n\nJoin industry leaders at the Transmission & Interconnection Summit 2026. For more than 25 years, this event has remained the premier forum dedicated to the business, policy, investment, and development landscape of transmission infrastructure. Explore the latest market developments, connect with key decision-makers, and gain the insights needed to navigate a rapidly changing energy future.\nReview the agenda, meet the expert faculty, and reserve your place today.\nEvent Highlights\n\n95 Expert Speakers\nHear from leading industry executives, policymakers, regulators, investors, and market stakeholders.\n\n\n19 Content-Packed Sessions\nGain exclusive market intelligence, actionable insights, and critical industry updates.\n\n\nPremier Networking Opportunities\nConnect with influential decision-makers, expand your network, and build valuable business relationships.\n\nVenue Information\nHamilton Hotel\n1001 14th Street NW\nWashington, DC 20005\nRoom Rate: $359 per night\nReservation Phone: (877) 714-7625\nReservation Link: Click Here\nReservation Deadline: Wednesday, May 20, 2026\nImportant Notice: Please book accommodations directly through the hotel using the contact information provided above. Infocast does not partner with third-party housing companies for this event. Reservations made through outside housing providers are not endorsed or guaranteed by Infocast.\n
URL:https://allstreaminsiders.com/events/register-now-for-the-transmission-and-interconnection-summit-by-infocast-june-23-25-2026-dc/
CATEGORIES:Conferences &amp; Industry Meetups
LOCATION:1001 14th St NW, Washington, DC 20005
ATTACH;FMTTYPE=image/jpeg:https://allstreaminsiders.com/wp-content/uploads/2026/06/Transmission-and-Interconnection-Summit-by-Infocast-June-23-25-2026-DC-Allstream.jpg
END:VEVENT
END:VCALENDAR
